Lakeshore Community Schools, Stevensville MI

Across three elementary schools, LG2 removed the old manual operable walls in every gym and replaced them with Modernfold Acousti-Seal Premier Electric walls. Now it's a turn of a key, and the gym is split and ready.

Video sped up to show the full close. The Modernfold Acousti-Seal Premier Electric wall in the Stewart Elementary gym at Lakeshore Community Schools in Stevensville, MI, traveling out of its stack and closing across the gym.
Stewart Elementary gym at Lakeshore Community Schools open to its full width, with the Modernfold Acousti-Seal Premier Electric operable wall stacked against the right side

Photo 1 of 5

Open: the wall stacks at the side and the whole gym is in use.
Product
Modernfold Acousti-Seal Premier Electric
Building type
Elementary school gyms
Location
Stevensville, MI

The project

How the space works

What the job needed

Lakeshore Community Schools (Lakeshore Public Schools) in Stevensville splits the gyms at Hollywood, Stewart and Roosevelt elementary schools for PE, lunch time and events. Each gym had an old manual operable wall that staff had to wrestle into place panel by panel.

A standard roll-down gym curtain only blocks the view. The district wanted a real wall: sound control and a clean, finished room on both sides, so two groups can use the gym at the same time without the noise carrying over.

What LG2 installed

LG2 demolished the old manual walls and installed a new Modernfold Acousti-Seal Premier Electric operable wall in each of the three gyms. Each wall is 60'-0" wide and 17'-11" high, with 15 continuously hinged panels rated STC 50.

The walls run on electric power. Staff turn the keyed switches and the panels travel out of the stack, close the opening and seal on their own. Modernfold electric walls use two keyed switches activated together, so only authorized staff can run them.

The panels are two-tone: vinyl on the lower half so it is easy to clean, and fabric on the upper half for sound absorption. A pass door with a recessed exit sign keeps both sides connected when the wall is closed.

Specifications

Operable wall specifications

Each of the three gym walls, per the Modernfold order.

System
Modernfold Acousti-Seal Premier Electric, continuously hinged
Schools
Hollywood, Stewart and Roosevelt elementary schools, one gym wall each
Size
60'-0" W x 17'-11" H (each wall)
Panels
15 per wall
Acoustics
STC 50
Operation
Electric, with keyed switches
Configuration
Single wall, single stack, side jamb closure
Finish
Two-tone: vinyl on the lower half for easy cleaning, fabric on the upper half for sound absorption
Egress
Pass door with a recessed exit sign

In operation

Open vs. closed

The Stewart Elementary gym from center court, open and closed.

  1. Straight-on view from center court of the open Stewart Elementary gym at Lakeshore Community Schools, with the full court in use and the Modernfold wall stacked at the right01 · Open
    Open: the full court, with the wall stacked at the right.
  2. Same center-court view with the Modernfold Acousti-Seal Premier Electric wall closed across the Stewart Elementary gym, two-tone gray panels with vinyl below and fabric above, and a pass door with an exit sign02 · Closed
    Closed: the same view with the gym split into two finished rooms.

Products used

Products and models

  • Modernfold Acousti-Seal Premier Electric

    Continuously hinged electric operable wall

    Electric, continuously hinged panels rated STC 50, run with keyed switches. Here: 60'-0" x 17'-11" walls of 15 two-tone panels with a pass door.

    See Modernfold Folding Panel Partitions →