Lakeshore Community Schools, Stevensville MI
Across three elementary schools, LG2 removed the old manual operable walls in every gym and replaced them with Modernfold Acousti-Seal Premier Electric walls. Now it's a turn of a key, and the gym is split and ready.

Photo 1 of 5
- Product
- Modernfold Acousti-Seal Premier Electric
- Building type
- Elementary school gyms
- Location
- Stevensville, MI
- Product line
- Modernfold Folding Panel Partitions →
The project
How the space works
What the job needed
Lakeshore Community Schools (Lakeshore Public Schools) in Stevensville splits the gyms at Hollywood, Stewart and Roosevelt elementary schools for PE, lunch time and events. Each gym had an old manual operable wall that staff had to wrestle into place panel by panel.
A standard roll-down gym curtain only blocks the view. The district wanted a real wall: sound control and a clean, finished room on both sides, so two groups can use the gym at the same time without the noise carrying over.
What LG2 installed
LG2 demolished the old manual walls and installed a new Modernfold Acousti-Seal Premier Electric operable wall in each of the three gyms. Each wall is 60'-0" wide and 17'-11" high, with 15 continuously hinged panels rated STC 50.
The walls run on electric power. Staff turn the keyed switches and the panels travel out of the stack, close the opening and seal on their own. Modernfold electric walls use two keyed switches activated together, so only authorized staff can run them.
The panels are two-tone: vinyl on the lower half so it is easy to clean, and fabric on the upper half for sound absorption. A pass door with a recessed exit sign keeps both sides connected when the wall is closed.
Replacing an old manual wall or a gym curtain?
See Modernfold folding panel partitions →Modernfold tech data and brochures →Replacing an older operable wall →Operable wall service and repair →Specifications
Operable wall specifications
Each of the three gym walls, per the Modernfold order.
- System
- Modernfold Acousti-Seal Premier Electric, continuously hinged
- Schools
- Hollywood, Stewart and Roosevelt elementary schools, one gym wall each
- Size
- 60'-0" W x 17'-11" H (each wall)
- Panels
- 15 per wall
- Acoustics
- STC 50
- Operation
- Electric, with keyed switches
- Configuration
- Single wall, single stack, side jamb closure
- Finish
- Two-tone: vinyl on the lower half for easy cleaning, fabric on the upper half for sound absorption
- Egress
- Pass door with a recessed exit sign
In operation
Open vs. closed
The Stewart Elementary gym from center court, open and closed.
01 · OpenOpen: the full court, with the wall stacked at the right.
02 · ClosedClosed: the same view with the gym split into two finished rooms.
Products used
Products and models
Modernfold Acousti-Seal Premier Electric
Continuously hinged electric operable wall
Electric, continuously hinged panels rated STC 50, run with keyed switches. Here: 60'-0" x 17'-11" walls of 15 two-tone panels with a pass door.
See Modernfold Folding Panel Partitions →
Gallery
Lakeshore Community Schools, Stevensville MI photos
Select any photo to view it full size.
Open: the wall stacks at the side and the whole gym is in use. Closing: the hinged panels travel out from the stack on their own. No one pushes a panel. Closed: a finished wall on both sides, with easy-clean vinyl below, sound-absorbing fabric above and a pass door with a recessed exit sign. Open: the full court, with the wall stacked at the right. Closed: the same view with the gym split into two finished rooms.