LG2, LLCAt your service, and His
Request a QuoteBased out of Grand Rapids, MI

GMB Grand Rapids Learning Hub

A Modernfold Acousti-Clear glass wall with clear anodized frames closes the Learning Hub at GMB's Grand Rapids office, then stacks to one side to open it to the work area.

Closed Modernfold Acousti-Clear glass wall with clear anodized frames at the GMB Grand Rapids Learning Hub

Photo 1 of 7

Closed: glass with clear anodized frames across the Learning Hub.
Product
Modernfold Acousti-Clear with clear anodized frames
Building type
Architecture firm office
Location
Grand Rapids, MI

The project

How the space works

What the job needed

The Learning Hub sits right off an open work area. It needed to close for sessions and open back up, with glass that keeps the room visible from the office.

What LG2 installed

LG2 installed a Modernfold Acousti-Clear glass operable wall with clear anodized frames. Acousti-Clear uses double-pane acoustical glass panels and is offered at STC 45 or 51.

Opened, the panels stack at the side and the Learning Hub joins the work area.

In operation

Closed, partly open, open

The same wall from the same spot.

  1. Closed Modernfold Acousti-Clear glass wall with clear anodized frames at the GMB Grand Rapids Learning Hub01 · Closed
    Closed: glass with clear anodized frames across the Learning Hub.
  2. Acousti-Clear glass wall at the GMB Learning Hub with the last panels at the stack02 · Partly open
    Partly open: the last panels at the stack.
  3. GMB Grand Rapids Learning Hub open to the office with the clear anodized framed glass panels stacked at the side03 · Open
    Open: the panels stacked at the side.

Products used

Products and models

  • Modernfold Acousti-Clear

    Double-pane acoustical glass operable wall

    4" double-pane glass panels for sound control with daylight, offered at STC 45 or 51.

    See Folding Glass Partitions →

More projects

Other LG2 projects

← All projects