Fowler High School Gymnasium, Fowler MI
LG2 installed a Modernfold Acousti-Seal Legacy operable partition across the Fowler High School gymnasium: 24 feet tall and more than 100 feet wide, with uncommon openings built into the system so people can walk the track while the wall is fully extended.

Photo 1 of 15
- Product
- Modernfold Acousti-Seal Legacy
- Building type
- High school gymnasium
- Location
- Fowler, MI
- Product line
- Modernfold Folding Panel Partitions →
The project
How the space works
What the job needed
The Fowler High School gymnasium needed a large operable wall that could split the space for teaching and practice, without shutting down the running track around the court when the wall was closed.
What LG2 installed
LG2 installed a Modernfold Acousti-Seal Legacy operable partition that spans the gym: 24 feet tall and more than 100 feet wide. The closed wall carries a custom Eagles mascot graphic and "Home of the Eagles" lettering.
Openings are built into the system at the sides, so people can keep walking the track while the wall is fully extended. That layout is uncommon on a gym divider of this size.
Specifications
Operable partition specifications
The gym divider LG2 installed at Fowler High School.
- System
- Modernfold Acousti-Seal Legacy
- Size
- 24 ft tall by more than 100 ft wide
- Building
- Fowler High School gymnasium, Fowler, MI
- Track openings
- Openings built into the system so the running track stays in use when the wall is fully extended
- Finish
- Custom Eagles mascot graphic and Home of the Eagles lettering
Products used
Products and models
Modernfold Acousti-Seal Legacy
Operable partition
A large solid-panel operable wall, here 24 feet tall and more than 100 feet wide, with openings built in so the running track stays in use when the wall is closed.
See Modernfold Folding Panel Partitions →
Gallery
Fowler High School Gymnasium, Fowler MI photos
Select any photo to view it full size.
Closed: the Eagles graphic and Home of the Eagles lettering span the wall. Closed, from center court, with a hoop in the foreground. Closed, from the running track, with the opening at the right. Closed: the opening at the right leaves the running track open. Closed, looking along the track toward the opening. Closed, from the track: the opening stays clear at the right. Closed, from the eagle side of the wall. Closed, from the left-hand side of the track. The Eagles graphic at closer range. People walking the track through the opening while the wall is fully extended. The Home of the Eagles lettering at close range. During installation: a panel on the floor, ready to be lifted into the track. During installation: the panel being lifted into the track. During installation: panels stacked and hanging in the gym. During installation: panels hanging from the overhead track.





